Group Project

Sunday, November 26, 2006

Work For next week

Hello,
Well i have finished the specification (although it is brief as everything was stated in the full study and feasability report) I have also finished a list of the functional requirements of the system. I will have the project plan finished and uploaded by tomorrow


http://www.demonhunter.co.uk/Uni/Group/specification.doc

I have also uploaded Darius's work, he has done a very good competitive analysis of two e-commerce sites. And also a site flow diagram for the navigation system of the site.

http://http://www.demonhunter.co.uk/Uni/Group/navigation.pdf
http://www.demonhunter.co.uk/Uni/Group/ECommerceAnalysis.pdf

I am still waiting for Adam's list of non-functional requirements, and Denis's E-R design pages. And also i need point for the spiral model e.g. Requirements Stage - deliverables are Feasiability, Full Study, Specification, requirements, and interview notes etc.

Ok, there will be no meeting tomorrow as i don't think it is necessary yet. If anyone needs to discuss anything with me, either post it on this blog or e-mail me and i will get back to you ASAP.

Work for Next Week

Ok we have now finished the Requirements and Analysis stage. Which means we are on design, so the work is as follows.

Adam - Finish off the site design with Denis, and the remaining work
Denis - Finish off the site design with Adam, and the remaining work
Darius - Programming design (how ever you want to do it psudeo code, top down design)
Daniel - Remaining work, some site design as well
Adam as the systems analysist you will be in charge of who does whcih design. The main ones that need to be designed are the homepage, User updating, User accounts screen, and product screen by next week.
The next meeting on the 4/12/06 will be taking place. As it will be the end of the design phase and we will check or work with tony and that will be all before christmas so people can finish coursework.
Thank you
Daniel Clarke