Hello,

Well i said that nobody needed to go to the meeting last week, My PC was down, so i e-mailed adam and Darius as i had there e-mail addresses and asked them to forward them to you. Which they didn't it seems anyway in regard to your questions.

I don't know anything about BaseCamp, do you need anything? is it free and could you please provide me with a link to it if you think it would be suitable.

We can use google groups if you would prefer. I will set up an account for it tomorrow and e-mail everybody the details for it.

I have never used UML, and it is a bit hard to create a DFD on a system that doesn't even exist yet.

Thank you for listing the requirements but i had already assigned me and Adam to do it. Hence why it is posted in the work list for adam.

I know my specification is a bit bland and brief, but most of, if not all has already been stated in Adam's Feasability and full study report. Including, technical, system, and business options. With justification. I will attempt to collerbrate that information in a conclusion tomorrow, to show it as a type of specification. So Adam can you please e-mail me copies of your work.

Regarding the E-R diagrams i had set you to do it, in the e-mail you never recieved, so you can do it this week and forget the other work i set you.

The reason i have been asking you to post information on the spiral model, is because you suggested using that methodolgy. Also you said you had information on it that you could post on the blog. The information you have posted is far too brief, i need to know the deliverables otherwise i can not lead this project properly. Personally i would prefer to use the SSADM method as i know it.

Ok well in the project process. I believe you have finished the requirements stage, to a satisfactory level. We have a feasability, full study, list of requirements, and a specification (admittely needs some work done to it).

For the analysis stage we probably need to do a little more work but without knowing about the sprial model i can not set tasks for it. We have a competitive site analysis, but not much else. Therefore i decided until this was completed, that we should move on to the design phase. Espically as i want the design phase finished before christmas break.

I can be more descriptive in my posts if you are having trouble understanding the meaning. I did list what pages needed to be designed. Basically i need page layouts for the main pages, Home Pages, Item Page, Update Page and user account page. As Darius has already designed the navigation of the site and effectively the site map this is all that really needs to be done for the design phase.

Anyway anymore problems or questions please e-mail me.

P.S. The reason i asked Darius to do psuedo code is i need some from of design for the programming side of it. Also i thought it might help you when you actually come to programming the database and website. However if both you and Darius think it is pointless it doesn't need to be completed and Darius can help with the site design page.